MultiMedia Products, Speakers, Earphones, Headsets
Base Price βΉ370.34 + βΉ66.66 GST (18%)
βΉ437.00
Speaker EVM EnDesk Plus Gaming 2.0 Computer Speaker EVM-BTS-208 | 3W Γ 23 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Cable Length, Black
- Brand :EVM
- Product SKU :EVM-BTS-208
- Category :MultiMedia Products, Speakers, Earphones, Headsets
-
Availability :
24 In Stock
Base Price βΉ370.34 + βΉ66.66 GST (18%)
βΉ437.00
βΉ2,063.82
- Model NameSpeaker EVM EnDesk Plus Gaming 2.0 Computer Speaker EVM-BTS-208 | 3W Γ 23 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Cable Length, Black
- BrandEVM
- CategoryMultiMedia Products, Speakers, Earphones, Headsets
- AvailabilityIn Stock
β Power supply: USB 5V 2
β Power RMS: 3W Γ 2 3
β Speaker: 2 inches Γ 2 4
β Signal to noise ratio SUR: β₯ 85dB 6
β Frequency response FR: 100Hz-20KHz 6
β Input sensitivity: 500 mV 7
β Color: Black 8>Distortion: β€ 5% 10>Impedance Impedance: 4 Ξ© 11
β Interface: USB head Ο 3.5 Stereo input 12
β Function: Line controlled tuning, RGB Product size: 74 * 83 * 125mm
β Cable length: 1.1m, Cable control volume
You may also like these
EVM
Base Price βΉ466.82 + βΉ84.03 GST (18%)
βΉ550.85
2 In Stock
Ram EVM 2GB DDR2 667MHz Desktop EVMT2G6670U86P | Long-DIMM Memory, Boost Your Computer's Performance with Reliable & Efficient Memory Upgrade
Base Price βΉ466.82 + βΉ84.03 GST (18%)
βΉ550.85
βΉ1,016.10
EVM
Base Price βΉ999.00 + βΉ179.82 GST (18%)
βΉ1,178.82
20 In Stock
Speaker EVM EnLumina Bluetooth Speaker EVM-BTS-201 | Bluetooth Version 5.3, 12 hours Playtime, 12 W RMS, 6.6cm Speaker Driver, 2000 MAh Battery, FM Radio, RGB Lights, Built-in Mic
Base Price βΉ999.00 + βΉ179.82 GST (18%)
βΉ1,178.82
βΉ1,321.60
EVM
Base Price βΉ799.00 + βΉ143.82 GST (18%)
βΉ942.82
1 In Stock
Cable Speaker EVM EnDesk 2.0 Wired Gaming Speaker EVM-BTS-207 | 3WΓ2 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Length, Black
Base Price βΉ799.00 + βΉ143.82 GST (18%)
βΉ942.82
βΉ1,062.00
EVM
Base Price βΉ1,100.00 + βΉ198.00 GST (18%)
βΉ1,298.00
9 In Stock
Speaker EVM EnBar Pro Bluetooth Speaker EVM-BTS-106 | 5.3 Bluetooth Version, 16 Hours Playtime, RGB Lights, 24 W RMS, 5.2cm x 2 Speaker Driver, 1200 mAh Battery, Built-in Mic, Black
Base Price βΉ1,100.00 + βΉ198.00 GST (18%)
βΉ1,298.00
βΉ5,898.82
Zebion
Base Price βΉ254.24 + βΉ45.76 GST (18%)
βΉ300.00
8 In Stock
Headphone Zebion HP-750 Over Ear Headphone with Rotatable Boom MIC, 2-Jack Connector with Volume Control, with 1.8-2.5M Cable Length, 80mW Max Output, Sturdy & Comfortable, Suitable for Devices with AUX Input | Colour:- Black
Base Price βΉ254.24 + βΉ45.76 GST (18%)
βΉ300.00
βΉ613.60
Zebion
Base Price βΉ635.59 + βΉ114.41 GST (18%)
βΉ750.00
6 In Stock
Zebion Everest Wireless Neckband | Bluetooth, 30H Playtime, 200H Standby, Stereo Sound, Inbuilt Mic, Water & Sweat Resistant, Magnetic Ends, Extra Bass, Carry Case, Black
Base Price βΉ635.59 + βΉ114.41 GST (18%)
βΉ750.00
βΉ2,358.82
EVM
Base Price βΉ1,580.01 + βΉ284.40 GST (18%)
βΉ1,864.41
6 In Stock
Ram EVM 4GB DDR4 3200MHZ Desktop EVMT4G3200U88P | Unleash Your System's Full Potential, Perfect for Gamers, Office Work
Base Price βΉ1,580.01 + βΉ284.40 GST (18%)
βΉ1,864.41
βΉ2,456.78
EVM
Base Price βΉ450.00 + βΉ81.00 GST (18%)
βΉ531.00
10 In Stock



