Components for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
Base Price βΉ440.68 + βΉ79.32 GST (18%)
βΉ520.00
Keyboard EVM EnHype EVM-WDK-612 Wired Gaming Keyboard | 62 Keys, USB Interface, LED Rainbow Backlit, 1.5m Cable Length, Smooth Keystrokes, Mobile Stand, Plug & Play, Black
- Brand :EVM
- Product SKU :EVM-WDK-612
- Category :Components for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
-
Availability :
10 In Stock
Base Price βΉ440.68 + βΉ79.32 GST (18%)
βΉ520.00
βΉ2,358.82
- Model NameKeyboard EVM EnHype EVM-WDK-612 Wired Gaming Keyboard | 62 Keys, USB Interface, LED Rainbow Backlit, 1.5m Cable Length, Smooth Keystrokes, Mobile Stand, Plug & Play, Black
- BrandEVM
- CategoryComponents for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
- AvailabilityIn Stock
β 62 Keys Gaming Keyboard
β Interface: USB, Plug and play
β Backlighting: Led Rainbow backlit
β FN+W to switch direction key FN+ light to switch breathing function,
β 19 anti-ghosting key
β Mobile Stand
β Smooth Keystrokes
β USB Interface
You may also like these
EVM
Base Price βΉ999.00 + βΉ179.82 GST (18%)
βΉ1,178.82
3 In Stock
Keyboard & Mouse Combo EVM Gaming Wired EnHawk WDKM-315 | 104 Keys, Backlight Keyboard, 1.5meter Cable Length, 3600 DPI Resolution, White
Base Price βΉ999.00 + βΉ179.82 GST (18%)
βΉ1,178.82
βΉ1,321.60
Zebion
Base Price βΉ677.97 + βΉ122.03 GST (18%)
βΉ800.00
4 In Stock
Cabinet Zebion ZB-1702 W/o Smps, Well Ventilated Design
Base Price βΉ677.97 + βΉ122.03 GST (18%)
βΉ800.00
βΉ1,770.00
EVM
Base Price βΉ5,250.00 + βΉ945.00 GST (18%)
βΉ6,195.00
5 In Stock
Ram EVM ELITE Gaming 8GB DDR4 3200MHZ Desktop EEAC8G32DT | Intel XMP/ AMD Expo Compatible, Aluminum Heat Sink in Slim Form Factor
Base Price βΉ5,250.00 + βΉ945.00 GST (18%)
βΉ6,195.00
βΉ9,438.82
Zebion
Base Price βΉ1,500.00 + βΉ270.00 GST (18%)
βΉ1,770.00
38 In Stock
Motherboard Zebion Marlin H81 with NVMe Slot | Socket 1150, Supports DDR3, Supports 4th Gen Intel Processors, NVMe Slot, 4 USB port, 1 x HDMI, 2 x 3.0 USB, 1 x VGA, 1 x LAN Port, 3 Audio jack, Onboard 4 x Sata 3.0, 2 Ram Slots, 1 x PCI Slot
Base Price βΉ1,500.00 + βΉ270.00 GST (18%)
βΉ1,770.00
βΉ10,148.00
Logitech
Base Price βΉ466.10 + βΉ83.90 GST (18%)
βΉ550.00
17 In Stock
Mouse Logitech M170 Wireless, 2.4 GHz with USB Nano Receiver, Optical Tracking, 12-Months Battery Life, Ambidextrous, PC / Mac / Laptop - Black
Base Price βΉ466.10 + βΉ83.90 GST (18%)
βΉ550.00
βΉ699.15
EVM
Base Price βΉ999.00 + βΉ179.82 GST (18%)
βΉ1,178.82
12 In Stock
Keyboard & Mouse Combo EVM Wireless Enkey WLKM & 3W042 | 104 Function Keys, 2.4Ghz Wireless Keyboard & 3D Wireless Mouse, USB, Plug & Play, Black+Blue
Base Price βΉ999.00 + βΉ179.82 GST (18%)
βΉ1,178.82
βΉ1,321.60
Gigabyte
Base Price βΉ12,209.14 + βΉ2,197.64 GST (18%)
βΉ14,406.78
2 In Stock
Gigabyte Z690 UD DDR4 Motherboard, LGA1700, Supports Intel 12th/13th/14th Gen Processors, 16+1+2 Phase Power Design, PCIe 5.0, 3Γ PCIe 4.0 M.2 with Thermal Guard, 2.5GbE LAN, USB 3.2 Gen 2x2 Type-C, Q-Flash Plus
Base Price βΉ12,209.14 + βΉ2,197.64 GST (18%)
βΉ14,406.78
βΉ28,813.56
Logitech
Base Price βΉ635.59 + βΉ114.41 GST (18%)
βΉ750.00
21 In Stock



