MultiMedia Products, Speakers, Earphones, Headsets
Base Price βΉ300.00 + βΉ54.00 GST (18%)
βΉ354.00
Headphone EVM Wired With Mic EnTune EVM-WDH-02 | Adjustable Stick Mic, 2-In-1 Usage Single & Dual 3.5mm Plug Type, Soft & Comfortable Cushions, Soothing Sound Quality, Adjustabble Headband, Black
- Brand :EVM
- Product SKU :EVM-WDH-02
- Category :MultiMedia Products, Speakers, Earphones, Headsets
-
Availability :
32 In Stock
Base Price βΉ300.00 + βΉ54.00 GST (18%)
βΉ354.00
βΉ1,532.82
- Model NameHeadphone EVM Wired With Mic EnTune EVM-WDH-02 | Adjustable Stick Mic, 2-In-1 Usage Single & Dual 3.5mm Plug Type, Soft & Comfortable Cushions, Soothing Sound Quality, Adjustabble Headband, Black
- BrandEVM
- CategoryMultiMedia Products, Speakers, Earphones, Headsets
- AvailabilityIn Stock
Adjustable Stick Mic
2-In-1 Usage Single & Dual 3.5mm Plug Type
Soft & Comfortable Cushions
Soothing Sound Quality
Adjustabble Headband
Black
You may also like these
EVM
Base Price βΉ450.00 + βΉ81.00 GST (18%)
βΉ531.00
10 In Stock
Speaker EVM EnGroove Bluetooth Speaker EVM-BTS-202 | Bluetooth Version 5.3, 12 Hours Playtime, 5W RMS, 1200mAh Battery, FM Radio, TWS Function, Rechargeble Battery, USB Type-C Charging Input Port, Built-in Mic, Black + Blue
Base Price βΉ450.00 + βΉ81.00 GST (18%)
βΉ531.00
βΉ2,830.82
EVM
Base Price βΉ1,580.01 + βΉ284.40 GST (18%)
βΉ1,864.41
6 In Stock
Ram EVM 4GB DDR4 3200MHZ Desktop EVMT4G3200U88P | Unleash Your System's Full Potential, Perfect for Gamers, Office Work
Base Price βΉ1,580.01 + βΉ284.40 GST (18%)
βΉ1,864.41
βΉ2,456.78
Logitech
Base Price βΉ508.47 + βΉ91.53 GST (18%)
βΉ600.00
7 In Stock
Headset Logitech H110 Wired | Stereo Headphone | Noise Cancelling Mic | 3.5mm Dual Audio Jack | PC/Mac/Laptop, Grey
Base Price βΉ508.47 + βΉ91.53 GST (18%)
βΉ600.00
βΉ809.32
EVM
Base Price βΉ800.00 + βΉ144.00 GST (18%)
βΉ944.00
12 In Stock
Speaker EVM EnBar Plus Bluetooth Speaker EVM-BTS-105 | 5.3 Bluetooth Version, 12 hours Playtime, RGB Lights, 16 W RMS, 5.2cm x 2 Speaker Driver, 1200 mAh Battery, USB Type-C Charging Input Port, Built-in Mic, Black
Base Price βΉ800.00 + βΉ144.00 GST (18%)
βΉ944.00
βΉ4,600.82
Logitech
Base Price βΉ5,254.24 + βΉ945.76 GST (18%)
βΉ6,200.00
1 In Stock
Headphone Logitech Zone Vibe 100 | Lightweight Wireless Over-Ear Headphones with Noise-Cancelling Microphone, Advanced Multipoint Bluetooth Headset, Works with Teams, Google Meet, Zoom, Mac / PC | Color: Rose
Base Price βΉ5,254.24 + βΉ945.76 GST (18%)
βΉ6,200.00
βΉ8,470.34
EVM
Base Price βΉ1,499.00 + βΉ269.82 GST (18%)
βΉ1,768.82
7 In Stock
Speaker EVM EnBar Glow Bluetooth Speaker EVM-BTS-104 | 15 Hours Playtime, RGB Lights, Bluetooth 5.3, 16W Portable Wireless Speaker, White
Base Price βΉ1,499.00 + βΉ269.82 GST (18%)
βΉ1,768.82
βΉ1,994.20
Logitech
Base Price βΉ553.00 + βΉ99.54 GST (18%)
βΉ652.54
13 In Stock
Headset Logitech Stereo H111 | Stereo Headphones, Single Pin, Noise-Cancelling Mic, 3.5 mm Audio Jack, Black
Base Price βΉ553.00 + βΉ99.54 GST (18%)
βΉ652.54
βΉ809.32
MultiMedia Products, Speakers, Earphones, Headsets
βΉ650.00
16 In Stock



