Sunny Enterprises
99706 36571

WhatsApp Us 24/7

All Categories
SSD Harddisk (Sata & Nvme)

Harddisk EVM EVMNV42/512GB M.2 NVME PCle Gen 3x4 (2242) SSD | 3D NAND Flash, High Speed Performance Up to 2000MB/s Read & 1600MB/s Write Speed, SATA III 6Gb/s Interface, Black

3D NAND Flash, High Speed Performance Up to 2000MB/s Read & 1600MB/s Write Speed

  • Brand :EVM
  • Product SKU :EVMNV42/512GB
  • Category :SSD Harddisk (Sata & Nvme)
  • Availability : 1 In Stock

Base Price β‚Ή7,038.20 + β‚Ή1,266.88 GST (18%) β‚Ή8,305.08 β‚Ή8,473.73

  • Specification
  • Description
  • Model NameHarddisk EVM EVMNV42/512GB M.2 NVME PCle Gen 3x4 (2242) SSD | 3D NAND Flash, High Speed Performance Up to 2000MB/s Read & 1600MB/s Write Speed, SATA III 6Gb/s Interface, Black
  • BrandEVM
  • CategorySSD Harddisk (Sata & Nvme)
  • AvailabilityIn Stock

About this item

  1. 2000MB/s Read, 900MB/s Write – Fast NVMe PCIe Performance: Sequential speeds of 2000MB/s read and 900MB/s write deliver a significant upgrade over HDD storage for faster boots, application loading, and file transfers.
  2. Compact M.2 (2242) Form Factor – Built for Space-Constrained Builds: The 2242 size fits ultra-slim laptops, mini-PCs, embedded systems, and small form factor desktops where standard 2280 drives are too large.
  3. 3D NAND Flash – High Endurance & Reliable Data Retention: 3D NAND technology delivers strong write endurance, consistent performance over time, and stable data retention across heavy daily computing workloads.
  4. 1500G Shock Resistance – Data Protection During Handling: Military-grade 1500G/0.5ms shock resistance safeguards stored data against physical impacts during travel and everyday handling.
  5. 2,000,000-Hour MTBF + 5-Year Warranty: Industry-standard 2,000,000-hour MTBF rating reflects long-term reliability. Backed by EVM's 5-Year manufacturer warranty for complete ownership confidence.

You may also like these

Fast & Reliable Delivery
100% Customer Satisfaction
Wholesale & Retail Pricing
Top IT & Electronics Brands
24/7 Support for Clients