SSD Harddisk (Sata & Nvme)
Base Price βΉ16,087.33 + βΉ2,895.72 GST (18%)
βΉ18,983.05
Harddisk EVM EVMNV42/1TB M.2 NVME PCle Gen 3x4 (2242) SSD | 3D NAND Flash, High Speed Performance Up to 2100MB/s Read & 1900MB/s Write Speed, SATA III 6Gb/s Interface, Black
3D NAND Flash, High Speed Performance Up to 2100MB/s Read & 1900MB/s Write Speed
- Brand :EVM
- Product SKU :EVMNV42/1TB
- Category :SSD Harddisk (Sata & Nvme)
-
Availability :
1 In Stock
Base Price βΉ16,087.33 + βΉ2,895.72 GST (18%)
βΉ18,983.05
βΉ22,033.05
- Model NameHarddisk EVM EVMNV42/1TB M.2 NVME PCle Gen 3x4 (2242) SSD | 3D NAND Flash, High Speed Performance Up to 2100MB/s Read & 1900MB/s Write Speed, SATA III 6Gb/s Interface, Black
- BrandEVM
- CategorySSD Harddisk (Sata & Nvme)
- AvailabilityIn Stock
About this item
- 2100MB/s Read, 1000MB/s Write β Fast NVMe PCIe Performance: Sequential speeds of 2100MB/s read and 1000MB/s write deliver a significant upgrade over HDD storage for faster boots, application loading, and file transfers.
- Compact M.2 (2242) Form Factor β Built for Space-Constrained Builds: The 2242 size fits ultra-slim laptops, mini-PCs, embedded systems, and small form factor desktops where standard 2280 drives are too large.
- 3D NAND Flash β High Endurance & Reliable Data Retention: 3D NAND technology delivers strong write endurance, consistent performance over time, and stable data retention across heavy daily computing workloads.
- 1500G Shock Resistance β Data Protection During Handling: Military-grade 1500G/0.5ms shock resistance safeguards stored data against physical impacts during travel and everyday handling.
- 2,000,000-Hour MTBF + 5-Year Warranty: Industry-standard 2,000,000-hour MTBF rating reflects long-term reliability. Backed by EVM's 5-Year manufacturer warranty for complete ownership confidence.
You may also like these
EVM
Base Price βΉ2,796.61 + βΉ503.39 GST (18%)
βΉ3,300.00
5 In Stock
Harddisk EVM Elite EnSave Pro 512GB External SSD EPSSDPro/512G | Smallest Portable SSD With 2000 Mb/s Read & 1700 Write Speed, USB 3.2 Gen 2x2 Type-C Interface, Multiple Device compatibility, Black
Base Price βΉ2,796.61 + βΉ503.39 GST (18%)
βΉ3,300.00
βΉ15,253.39
SanDisk
Base Price βΉ682.27 + βΉ122.81 GST (18%)
βΉ805.08
7 In Stock
Card SD SanDisk 64GB Ultra SDHC UHS-I Memory Card - 100MB/s, C10, U1, Full HD | SDSDUNR-064G-GN3IN
Base Price βΉ682.27 + βΉ122.81 GST (18%)
βΉ805.08
βΉ847.46
EVM
Base Price βΉ3,199.00 + βΉ575.82 GST (18%)
βΉ3,774.82
12 In Stock
Ram EVM 16GB DDR4 3200MHZ Desktop EVMT16G3200U88P
Base Price βΉ3,199.00 + βΉ575.82 GST (18%)
βΉ3,774.82
βΉ4,248.00
SanDisk
8 In Stock
Card SD SanDisk Extreme 64GB SD UHS-I SDSDXV2-064G-GNCIN | U3, V30, 4K,170MB/s Read & 80MB/s Write Speed, Card For 4K Video For DSLR & Mirrorless Cameras
Base Price βΉ1,059.32 + βΉ190.68 GST (18%) βΉ1,250.00
SanDisk
Base Price βΉ553.00 + βΉ99.54 GST (18%)
βΉ652.54
25 In Stock
Pendrive SanDisk 32GB Ultra Luxe USB 3.1 Gen 1 Flash Drive - 150MB/s, Metal Casing | SDCZ74-032G-I35
Base Price βΉ553.00 + βΉ99.54 GST (18%)
βΉ652.54
βΉ762.71
WD
Base Price βΉ15,168.06 + βΉ2,730.25 GST (18%)
βΉ17,898.31
1 In Stock
Harddisk WD 6tb Surveillance, 6 Gb/s SATA, 256MB Cache, 3.5 Inch WD64PURZ (Purple)
Base Price βΉ15,168.06 + βΉ2,730.25 GST (18%)
βΉ17,898.31
βΉ20,254.24
EVM
Base Price βΉ1,602.27 + βΉ288.41 GST (18%)
βΉ1,890.68
18 In Stock
Pendrive EVM 128GB Elite Nano Type C OTG USB 3.2 Gen 1 Flashdrive EEPOT/128G | Performance Read up to 100MB/s, Performance Write up to 30MB/s, Silver
Base Price βΉ1,602.27 + βΉ288.41 GST (18%)
βΉ1,890.68
βΉ3,558.47
SanDisk
Base Price βΉ1,694.92 + βΉ305.08 GST (18%)
βΉ2,000.00
9 In Stock





