SSD Harddisk (Sata & Nvme)
Base Price βΉ15,081.15 + βΉ2,714.61 GST (18%)
βΉ17,795.76
Harddisk EVM EVMNV30/1TB M.2 NVME PCle Gen 3x4 (2230) SSD | 3D NAND Flash, High Speed Performance Up to 3000MB/s Read & 1900MB/s Write Speed
3D NAND Flash, High Speed Performance Up to 3000MB/s Read & 1900MB/s Write Speed
- Brand :EVM
- Product SKU :EVMNV30/1TB
- Category :SSD Harddisk (Sata & Nvme)
-
Availability :
1 In Stock
Base Price βΉ15,081.15 + βΉ2,714.61 GST (18%)
βΉ17,795.76
βΉ22,033.05
- Model NameHarddisk EVM EVMNV30/1TB M.2 NVME PCle Gen 3x4 (2230) SSD | 3D NAND Flash, High Speed Performance Up to 3000MB/s Read & 1900MB/s Write Speed
- BrandEVM
- CategorySSD Harddisk (Sata & Nvme)
- AvailabilityIn Stock
About this item
- 3000MB/s Read, 1900MB/s Write β Fast NVMe PCIe Gen 3x4 Performance: Sequential speeds of 3000MB/s read and 1900MB/s write deliver a significant upgrade over HDD storage for faster boots, application loading, and file transfers.
- Compact M.2 (2230) Form Factor β Built for Space-Constrained Builds: The 2230 size fits ultra-slim laptops, mini-PCs, embedded systems, and small form factor desktops where standard 2280 drives are too large.
- 3D NAND Flash β High Endurance & Reliable Data Retention: 3D NAND technology delivers strong write endurance, consistent performance over time, and stable data retention across heavy daily computing workloads.
- 1500G Shock Resistance β Data Protection During Handling: Military-grade 1500G/0.5ms shock resistance safeguards stored data against physical impacts during travel and everyday handling.
- 2,000,000-Hour MTBF + 5-Year Warranty: Industry-standard 2,000,000-hour MTBF rating reflects long-term reliability. Backed by EVM's 5-Year manufacturer warranty for complete ownership confidence.
You may also like these
EVM
Base Price βΉ4,599.00 + βΉ827.82 GST (18%)
βΉ5,426.82
2 In Stock
RAM EVM 16GB DDR5 4800MHz SODIMM EVMT16G4800S86P | Laptop Ram
Base Price βΉ4,599.00 + βΉ827.82 GST (18%)
βΉ5,426.82
βΉ6,100.60
EVM
Base Price βΉ15,081.87 + βΉ2,714.74 GST (18%)
βΉ17,796.61
3 In Stock
Harddisk EVM 2TB EVM25/2TB 2.5 Inch SATA 3.0 Internal SSD | Read 550MB/s & Write Speed 500MB/s
Base Price βΉ15,081.87 + βΉ2,714.74 GST (18%)
βΉ17,796.61
βΉ18,643.22
SanDisk
Base Price βΉ598.25 + βΉ107.68 GST (18%)
βΉ705.93
2 In Stock
Pendrive SanDisk 32GB Ultra Dual Drive Go USB Type-C Flash Drive - 150MB/s, Black | SDDDC3-032G-I35
Base Price βΉ598.25 + βΉ107.68 GST (18%)
βΉ705.93
βΉ1,186.44
EVM
Base Price βΉ1,767.45 + βΉ318.14 GST (18%)
βΉ2,085.59
10 In Stock
Pendrive EVM EnStore+ 256GB Metal USB 3.2 FlashDrive | High Speed up to 100MB/s Read & 30MB/s Write Speeds, Durable Metal Casing, Ideal For Fast Data Transfer & Storage Solution, Brown
Base Price βΉ1,767.45 + βΉ318.14 GST (18%)
βΉ2,085.59
βΉ3,812.71
Gigabyte
Base Price βΉ6,500.00 + βΉ1,170.00 GST (18%)
βΉ7,670.00
4 In Stock
Harddisk Gigabyte Gen4 4000E 500GB SSD | M.2 2280 NVMe 1.4, PCIe 4.0 x4, 3D NAND, Up to 3600MB/s Read & 3000MB/s Write
Base Price βΉ6,500.00 + βΉ1,170.00 GST (18%)
βΉ7,670.00
βΉ16,638.00
EVM
Base Price βΉ3,898.31 + βΉ701.69 GST (18%)
βΉ4,600.00
3 In Stock
Harddisk EVM EnSave 512GB External SSD EPSSD/512G | Smallest Portable SSD With 550 Mb/s Read & 500 Mb/s Write Speed, USB 3.1 Gen 2 Type C, Compatible With All PCs & Laptops With USB Port, Black
Base Price βΉ3,898.31 + βΉ701.69 GST (18%)
βΉ4,600.00
βΉ12,711.02
SanDisk
Base Price βΉ1,526.14 + βΉ274.71 GST (18%)
βΉ1,800.85
1 In Stock
Pendrive SanDisk 2-in-1 USB 3.2 Gen 1 Mobile Pen Drive 256GB SDDDC6-256G- I46PO | USB Type-C & Type-A For Smartphones, Tablets & Computers, Purple Opulence
Base Price βΉ1,526.14 + βΉ274.71 GST (18%)
βΉ1,800.85
βΉ2,457.63
SanDisk
Base Price βΉ4,165.47 + βΉ749.78 GST (18%)
βΉ4,915.25
1 In Stock




